Pulled the p/s battery tray, airbox frame and coolant tank to make room for twins. Installed a FASS 150. Tomorrow finish plumbing the FASS, put in a triple overhead gauge pod and run the wires for the new oil temp gauge. Maybe chip a couple hundred pounds of mud out of the frame rails.