I'd like to put this out there to those that have done this before. I read through a lot of threads here on those that re plumbed their fuel systems.
I have a decent supply of An hose including enough Steel braided AN10 to run a supply from the LP to the Engine bay. My other option is to run 5/8 seamless aluminum which I would have to purchase.
I understand the stock line for the most part will be enough to supply 700 all day long, but my thoughts were, if I had it why not.
Can steel braided line be utilized and not gt gigged in a tech inspection?
I have a decent supply of An hose including enough Steel braided AN10 to run a supply from the LP to the Engine bay. My other option is to run 5/8 seamless aluminum which I would have to purchase.
I understand the stock line for the most part will be enough to supply 700 all day long, but my thoughts were, if I had it why not.
Can steel braided line be utilized and not gt gigged in a tech inspection?