Ok fellas, who has ported the fittings where the injectors connect to the rail?
f8afac9654fe54921f0a2a1679e3887b.jpg


I see there are little nipples on the underside of those fittings I'm thinking that if I drill em out I still have those nipples to contend with seems like they would kind of obstruct the fuel a little. How much have you guys taken out of the fittings(what size drill bit?) I'm kinda thinking maybe I'll just hone out the entire rail getting rid of the nipples all together the rail also has a lip where it's stepped down in size in the inner diameter I would hone that out some as well. Anyways if you guys have any info it would be greatly appreciated I have a spare set of rails so I'm not hurting anything by Guinea pigging.


Lbz, built trans, efi by Danville, Danville 68, full egr delete, mbrp down pipe, 5" mbrp to 7" stack, ppe guages, custom traction bars, airdog2 165, ppe fuel rail mods, s&b, afe blade runner, Arp head studs..died March 2015

Parts collected for the build. SoCal super damper, SoCal billet flex plate, SDP S400 kit, II 85% CP3, PPE manifolds/up pipes, PCV reroute. Slowly but surely lol
 

hipp11B

New member
Apr 1, 2015
252
0
0
Georgia
Well I've already figured some things out on my own, still curious what others have to say...anybody?


Lbz, built trans, efi by Danville, Danville 68, full egr delete, mbrp down pipe, 5" mbrp to 7" stack, ppe guages, custom traction bars, airdog2 165, ppe fuel rail mods, s&b, afe blade runner, Arp head studs..died March 2015

Parts collected for the build. SoCal super damper, SoCal billet flex plate, SDP S400 kit, II 85% CP3, PPE manifolds/up pipes, PCV reroute. Slowly but surely lol
 

hipp11B

New member
Apr 1, 2015
252
0
0
Georgia
That hole compared to your holes in nozzles I would not see a benifit.



Never really thought about it that way, but at the same time if you added up all 7 holes X 8 injectors at 250% stock size then compared it then maybe? Never really know till you try and since I have an extra set I figured ahh what the hell! If it doesn't work then oh well I will know one way not to do something if it does help then great lol
 

hipp11B

New member
Apr 1, 2015
252
0
0
Georgia
Never mind that doesn't make sense what I said hahaha I'm tired as **** don't kill me lol


Lbz, built trans, efi by Danville, Danville 68, full egr delete, mbrp down pipe, 5" mbrp to 7" stack, ppe guages, custom traction bars, airdog2 165, ppe fuel rail mods, s&b, afe blade runner, Arp head studs..died March 2015

Parts collected for the build. SoCal super damper, SoCal billet flex plate, SDP S400 kit, II 85% CP3, PPE manifolds/up pipes, PCV reroute. Slowly but surely lol
 

Dozerboy

Well-known member
Jun 23, 2009
5,088
683
113
TX of course
Um I think guy are just running lly rails instead of porting lbzs. You better do a HELL of a job cleaning them out if you drill those.
 

hipp11B

New member
Apr 1, 2015
252
0
0
Georgia
Um I think guy are just running lly rails instead of porting lbzs. You better do a HELL of a job cleaning them out if you drill those.



Dozerboy, yea I did some digging and Sean where guys were doing that. They didn't think you could drill these because of the nipples that went down inside the rail, those nipples are actually just pressed in there and can be removed I found. And yes they will be cleaned VERY well. I have an industrial parts washer, air, among other things at my disposal, wouldn't take but I tiny piece of metal to wreck an injector