Ok fellas, who has ported the fittings where the injectors connect to the rail?
I see there are little nipples on the underside of those fittings I'm thinking that if I drill em out I still have those nipples to contend with seems like they would kind of obstruct the fuel a little. How much have you guys taken out of the fittings(what size drill bit?) I'm kinda thinking maybe I'll just hone out the entire rail getting rid of the nipples all together the rail also has a lip where it's stepped down in size in the inner diameter I would hone that out some as well. Anyways if you guys have any info it would be greatly appreciated I have a spare set of rails so I'm not hurting anything by Guinea pigging.
Lbz, built trans, efi by Danville, Danville 68, full egr delete, mbrp down pipe, 5" mbrp to 7" stack, ppe guages, custom traction bars, airdog2 165, ppe fuel rail mods, s&b, afe blade runner, Arp head studs..died March 2015
Parts collected for the build. SoCal super damper, SoCal billet flex plate, SDP S400 kit, II 85% CP3, PPE manifolds/up pipes, PCV reroute. Slowly but surely lol
I see there are little nipples on the underside of those fittings I'm thinking that if I drill em out I still have those nipples to contend with seems like they would kind of obstruct the fuel a little. How much have you guys taken out of the fittings(what size drill bit?) I'm kinda thinking maybe I'll just hone out the entire rail getting rid of the nipples all together the rail also has a lip where it's stepped down in size in the inner diameter I would hone that out some as well. Anyways if you guys have any info it would be greatly appreciated I have a spare set of rails so I'm not hurting anything by Guinea pigging.
Lbz, built trans, efi by Danville, Danville 68, full egr delete, mbrp down pipe, 5" mbrp to 7" stack, ppe guages, custom traction bars, airdog2 165, ppe fuel rail mods, s&b, afe blade runner, Arp head studs..died March 2015
Parts collected for the build. SoCal super damper, SoCal billet flex plate, SDP S400 kit, II 85% CP3, PPE manifolds/up pipes, PCV reroute. Slowly but surely lol